After-sales Service: | Technical Support |
---|---|
Warranty: | One Year |
Material: | Steel |
Type: | Mobile |
Structural Style: | Multi-Pole Scaffolding |
Framework: | Combined Scaffolding |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Galvanized Steel Ringlock Scaffolding Vertical Standard with/without Spigot Q355B Steel Tubes OD48.3 x 3.2mm |
||||
Code | Item | Length | ||
UP-WJ001 | Ringlock Standard 0.5M | 0.5M | 1'8" | |
UP-WJ002 | Ringlock Standard 1.0M | 1.0M | 3'3" | |
UP-WJ003 | Ringlock Standard 1.5M | 1.5M | 4'11" | |
UP-WJ004 | Ringlock Standard 2.0M | 2.0M | 6'7" | |
UP-WJ005 | Ringlock Standard 2.5M | 2.5M | 8'2" | |
UP-WJ006 | Ringlock Standard 3.0M | 3.0M | 9'10" | |
Galvanized Steel Ringlock Scaffolding Horizontal Ledger Q355B/Q235B Steel Tube OD48.3 x 3.2mm/3.0mm/2.75mm/2.5mm |
||||
Code | Item | Length | ||
WF-RL001 | Ringlock Ledger 0.65M | 0.65M | 2'2" | |
WF-RL002 | Ringlock Ledger 1.07M | 1.07M | 3'6" | |
WF-RL003 | Ringlock Ledger 1.57M | 1.57M | 5'2" | |
WF-RL004 | Ringlock Ledger 2.13M | 2.13M | 7' | |
WF-RL005 | Ringlock Ledger 2.44M | 2.44M | 8' | |
WF-RL006 | Ringlock Ledger 3.05M | 3.05M | 10' |
1. Location: UPLight Stage Equipment is leading scaffolding and stage building manufacturer, located in Guangzhou, China.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, Moving head lights , Stage Equipments , and Truss etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 5-8 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: GuangZhou Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?
A: Yes, but usually the customer will pay for the cost and freight charges.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Suppliers with verified business licenses