After-sales Service: | Technical Support |
---|---|
Warranty: | One Year |
Material: | Steel |
Type: | Mobile |
Structural Style: | Multi-Pole Scaffolding |
Framework: | Combined Scaffolding |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Item No. | Description | Size | Weight (kgs) |
UP-WG-3000 | Vertical Standard 3.0m | 60mmx3.2mmx3000mm | 18.23 |
UP-WG-2500 | Vertical Standard 2.5m | 60mmx3.2mmx2500mm | 15.40 |
UP-WG-2000 | Vertical Standard 2.0m | 60mmx3.2mmx2000mm | 12.61 |
UP-WG-1500 | Vertical Standard 1.5m | 60mmx3.2mmx1500mm | 9.75 |
UP-WG-1000 | Vertical Standard 1.0m | 60mmx3.2mmx1000mm | 6.94 |
UP-WG-500 | Vertical Standard 0.5m | 60mmx3.2mmx500mm | 4.1 |
1. Location: UPLight Stage Equipment is leading scaffolding and stage building manufacturer, located in Guangzhou, China.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, Moving head lights , Stage Equipments , and Truss etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 5-8 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: GuangZhou Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?
A: Yes, but usually the customer will pay for the cost and freight charges.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Suppliers with verified business licenses